The other thing is (I assume) that if there pillars were removed the Leithcness would be removed, which isn't what is wanted is it?
Pogleswoody wrote:
two words … possibly one… Skyhooks … errmmm … Sky Hooks
IJN wrote: The other thing is (I assume) that if there pillars were removed the Leithcness would be removed, which isn't what is wanted is it?
Pogleswoody wrote:rsp4 wrote: Wow some progress this week on the old roof removal. That is impressive.
With regards to the corner being built over the new changing rooms that is how the designs show it. If you look closely you can see the modular drawn under the corner. loads of room underneath if you don't fill in and make a concourse.
With regards the pillars.Taking them away would be significantly more cost than we are paying. Not even sure the old stand structure would hold something without the front pillars. Surely something would need building over. An architect can answer that one
two words … possibly one… Skyhooks … errmmm … Sky Hooks
BHS wrote:IJN wrote: The other thing is (I assume) that if there pillars were removed the Leithcness would be removed, which isn't what is wanted is it?
Agree plus the cost of cantilevered roof would be 3 to 4 times more expensive than the £1millon mentioned for what we will be getting. I count 6 pillars in total wondered if this would be reduced to 4 since the offset between the outer pillars is fairly short. Does anybody know the build sequence is the new facade and roof going up next?
Users browsing this forum: Green_guile, Herts_Green and 24 guests