Kentishgreen":1ps7szzu said:They’ll need drains then.
And a stepladder. (Which incidentally, I spotted in the grandstand last night, in a location not generally requiring the use of a stepladder. I suspect a game is being played).
Kentishgreen":1ps7szzu said:They’ll need drains then.
Argylegames":3rt2rqa0 said:Looks like the digger is clearing a route from the back of the Barn Park to the side of the grandstand at pitch level.
The Grumpy Loyal":22vuh9p7 said:Let’s not kids ourselves here. The timetables for everything to be completed are out of the window. The original plan was for Corporate to be served in the new GT building from the start of this season! Now we see a planning application for that has only just gone in!
Anyone who seriously still thinks the Grandstand refurb will be finished by the end of next August is about as far detached from reality as it’s possible to get. Forget the corners. Why isn’t anything happening on the actual Grandstand? It’s all very well Jon Back saying nothing, or when he does blog, devotes an overwhelming majority of a blog to the re-positioned portakabin control room.
If this is the actual planned rate of progression, and GL’s workforce consists of pretty much one man and his dog, just tell us!
The Grumpy Loyal":2ofr7ji1 said:Let’s not kids ourselves here. The timetables for everything to be completed are out of the window. The original plan was for Corporate to be served in the new GT building from the start of this season! Now we see a planning application for that has only just gone in!
Anyone who seriously still thinks the Grandstand refurb will be finished by the end of next August is about as far detached from reality as it’s possible to get. Forget the corners. Why isn’t anything happening on the actual Grandstand? It’s all very well Jon Back saying nothing, or when he does blog, devotes an overwhelming majority of a blog to the re-positioned portakabin control room.
If this is the actual planned rate of progression, and GL’s workforce consists of pretty much one man and his dog, just tell us!
Willis88":21m1nb31 said:The images loaded to GoS last week showed the seats being removed and other internal signs coming down, there's sign of progress inside the grandstand you just can't see it on the camera.
All the of your theory relies on the assumption that gutting and tearing up the existing structure is task number 1 on their list.
I would argue none of that can really be done until the temp changing rooms are in place to allow for the site to be fully devoid of non-construction staff (i.e. players and officials using the changing rooms)
In the meantime they're doing what else can be done without disrupting the above (i.e. demo of Chisholm - needed for the new changing rooms - and removal of seats).
From John's blog we know that they've adjusted the timetable to bring forward the temp changing rooms, so I would therefore surmise that the progress they're currently making is at the planned rate, and once the changing rooms are in operation they'll move ahead of schedule (assuming the schedule has been adjusted to allow for time working on the supporters bar).
Now I'm aware I've assumed most of the above, however it seems a more reasonable position than blankly stating everything's fallen behind.
Everything I've concluded above has been derived from the information (evidence) given by the club, what you can see on the cameras and the wonderful work of Steve and the GoS team.
HC Green":yda074oz said:Willis88":yda074oz said:The images loaded to GoS last week showed the seats being removed and other internal signs coming down, there's sign of progress inside the grandstand you just can't see it on the camera.
All the of your theory relies on the assumption that gutting and tearing up the existing structure is task number 1 on their list.
I would argue none of that can really be done until the temp changing rooms are in place to allow for the site to be fully devoid of non-construction staff (i.e. players and officials using the changing rooms)
In the meantime they're doing what else can be done without disrupting the above (i.e. demo of Chisholm - needed for the new changing rooms - and removal of seats).
From John's blog we know that they've adjusted the timetable to bring forward the temp changing rooms, so I would therefore surmise that the progress they're currently making is at the planned rate, and once the changing rooms are in operation they'll move ahead of schedule (assuming the schedule has been adjusted to allow for time working on the supporters bar).
Now I'm aware I've assumed most of the above, however it seems a more reasonable position than blankly stating everything's fallen behind.
Everything I've concluded above has been derived from the information (evidence) given by the club, what you can see on the cameras and the wonderful work of Steve and the GoS team.
The players have been using the GT tent for meals etc as the only part of the grandstand in use are the changing rooms.